Front garden to permeable driveway
6 days on site
Drag the handle, or use the arrow keys, to compare.Illustrative before and after, not photographs.
A new-build with a sloping, waterlogged garden and a driveway too narrow for two cars.
A dry, usable garden and parking for two cars, done in under two weeks.
6 days on site
3 days on site