Concept site by SiteSync Solutions. Harrow Build Co. is not a real business; no quote requests are sent.
Loft conversionsWorksop8 weeks

Rear dormer loft with en-suite on a 1930s semi

Illustration after the work: Rear dormer loft with en-suite on a 1930s semi Illustration before the work: Rear dormer loft with en-suite on a 1930s semi

Drag the handle, or use the arrow keys, to compare.Illustrative before and after, not photographs.

The brief

A couple working from home needed a third bedroom without giving up the box room they used as an office.

What we did

  • Full-width rear dormer under permitted development
  • New oak-tread staircase over the existing stairs
  • Double bedroom with an en-suite shower room
  • Fire doors throughout and mains-linked smoke alarms

The result

A third double bedroom and en-suite, with the office kept. The scaffolding was down in seven weeks and the stairs went in in two days.

More projects like this

CallGet a quote