Kitchen-diner extension on a canal-side terrace
12 weeks on site
Drag the handle, or use the arrow keys, to compare.Illustrative before and after, not photographs.
A couple working from home needed a third bedroom without giving up the box room they used as an office.
A third double bedroom and en-suite, with the office kept. The scaffolding was down in seven weeks and the stairs went in in two days.
12 weeks on site
7 weeks on site